- Sawtooth Mining, our mining contractor who is performing most of the construction-related earthwork, is continuing excavation of the process plant pad, which is currently over 80% complete
- Highmark Construction, our general fill earthworks contractor, is nearly 55% complete with general fill placement
Companies currently on site at Thacker Pass:
Company: | Role: |
Lithium Americas Corp | Primary owner of the Thacker Pass Project |
Sawtooth Mining | Mining contractor performing most of the construction-related earthwork |
Bechtel | Engineering, procurement and construction management (EPCM) contractor |
Gamma Electric | Electrical contractor |
Allied Universal Security | Site security |
Hunt & Sons | Fuel supply |
Desert Disposal | Waste management |
GrayMar Environmental, Inc. | Environmental field services |
Ruby Mountain Natural Spring Water | Drinking water supplier |
Empire CAT | Heavy equipment supplier and servicer |
Komatsu | Equipment supplier and servicer |
NewFields | Civil engineering: design, geotechnical analysis, quality assurance |
High Mark Construction | General fill earthworks contractor |
Malta Ready Mix | Concrete foundation contractor |
Stoney Basin | Road maintenance |
Hunewill Construction | Aggregate supplier |
Sanbell Engineering | Land surveying |
Piteau Associates | Water monitoring |
WORKFORCE HUB PROJECT MILESTONES
Solid Beginnings: Workforce Hub Takes Shape with First Concrete Pour
The first Workforce Hub concrete pour took place last week for the first dormitory building foundation and consisted of 67 cubic yards of concrete. The freshly poured concrete is pictured above, curing under heating blankets.
Pictured below are Brahma Group staff (one of our concrete foundation contractors) and photos of their work as they build the formwork for future concrete pours.
Workforce Hub updates:
- City of Winnemucca building inspections are ongoing
- Sanbell Engineering, our civil engineering contractor, is inspecting soils compaction, sewer installation and placement of concrete
- Target Hospitality, our contractor selected for installation and operation of the Workforce Hub, is conducting pre-installation inspections on modules to prepare for setting the modules in place.
- Progress on the foundation includes the following:
- Joy Engineering, our contractor for sewer, drainage and roadways is currently grading and generating structural fill
- More than 80 pre-cast foundations have been set
- 9 cast-in-place foundations have been placed
Companies currently on site at the Workforce Hub:
Company: | Role: |
Lithium Americas Corp | Owner of the Workforce Hub |
Bechtel | Engineering, procurement and construction management (EPCM) contractor |
Wood Group | Structural engineer |
Sanbell Engineering | Civil engineer |
Joy Engineering | Installing onsite sewer improvements and roadways |
Brahma Group | Concrete foundation contractor |
Jensen Pre-Cast | Concrete foundation contractor |
Nevada Building Supply (NBS) | Aggregate supplier, also supplying structural steel |
Humboldt Ready Mix | Concrete foundation contractor |
Ruby Mountain Natural Spring Water | Drinking water supplier |
Desert Disposal | Waste management |
Civeo | Vendor of the Workforce Hub modules |
Karve Builders | Civeo’s contractor on site for module remediation |
ServiceMaster | Assisting Karve with preparing the modules |
Target Hospitality | Contractor selected for installation and operation of the Workforce Hub |